This project “power system underground pipe corridor project” is located in Nanjing.The project need construct under the high voltage line, so there is high limited requirement. Die roterende boorinstallasie word aangepas. As gevolg van die kliënt se relatiewe hoë vereistes oor meganiese toerusting en die hantering van komplekse geologiese toestande. The geology of this project is mainly soil layer, weathered rock, drilling diameter 800mm, drilling depth 15m, hole forming time is about 25 minutes, in general, 10 hours construction forms 21 holes, also with hanging steel cage in the middle. Forming hole efficiency as well as machine performance to obtain customer recognition.